Project_ID17 Maintenance and lifecycle management of a STM32 MCU & MPU Evaluation Tool PFE
Project_ID17 Maintenance and lifecycle management of a STM32 MCU & MPU Evaluation Tool PFE
STMicroelectronics•Tunisie
Embedded Systems (Raspberry Pi)Hardware EngineeringProduct Lifecycle Management
Publié il y a environ 2 heures
Stage
⏱️4-6 mois
💼Hybride
💰Rémunéré
📅Expire dans 14 jours
Épingle tes projets utiles sur GitHub.
Description du poste
Purpose / Objectives
Ensure long-term reliability and availability of STM32 MCU and MPU evaluation tools through proactive component obsolescence management.
Provide hands-on experience in hardware maintenance and industrialization processes, exposing the trainee to real-world product lifecycle challenges.
Main Responsibilities / Work To Be Done
Monitor and manage obsolescence alerts for electronic components and identify suitable replacements (footprint, electrical compatibility, sourcing).
Redesign related promotion/evaluation boards ensuring compliance with design standards and prepare updated manufacturing files (Gerbers, BOM, assembly drawings).
Update production test packages to reflect hardware revisions and synchronize test procedures with new board revisions.
Revise and publish all technical documentation across internal and external platforms to reflect hardware changes and ensure traceability.
Drive the management and synchronization of critical project milestones from kick-off to product release, coordinating with stakeholders to meet release targets.
Required Skills & Tools / Technical Keywords
STM32 MCUs and MPUs experience and general electronics knowledge (component selection, PCB design considerations).
Altium Designer for schematic/PCB redesign, generation of manufacturing files and BOM management.
Embedded C for firmware understanding; Python and VBA for automation of scripts and data processing.
Version control and documentation tools: Subversion (TortoiseSVN), Microsoft Office (Word, Excel) and documentation publishing workflows.
Expected Deliverables / Outcomes
Updated/evaluated component list with documented replacements and risk assessment for obsolescence.
Redesigned promotion/evaluation boards with complete manufacturing files and updated BOMs.
Revised production test packages and validated test procedures for the revised hardware.
Published and synchronized technical documentation across internal and external platforms; clear project milestone tracking until release.