Huber+Suhner
Huber+Suhner
Tunisie

Project 05 Global Optimization of the NACS Production Line: Ergonomics, Standardization, and Workstation Balancing PFE

industrial engineeringRisk Assessment & ErgonomicsProcess Optimization

Publié il y a environ 11 heures

Stage
⏱️4-6 mois
💼Hybride
📅Expire dans 13 jours
Version adaptée à l’offre, pas générique.

Description du poste

Project overview

  • Address inefficiencies caused by unbalanced workstations, non-ergonomic setups and lack of standardization on the NACS production line.
  • Focus on material and tool handling optimization, reducing operator fatigue and improving overall line efficiency; includes 5S improvements.

Main tasks and methodology

  • Perform workstation balancing: time studies, Value Stream Mapping (VSM) and cycle time analysis to identify bottlenecks and imbalances.
  • Evaluate and redesign non-ergonomic workstations; propose and implement adequate material and tool supports and standardized work sequences.
  • Implement 5S and other Lean tools to improve material flow and reduce waste of motion and time.

Expected results and deliverables

  • Delivery of a balanced production line with ergonomic workstations and standardized work instructions.
  • Measurable improvements including optimized production flow and a target increase in efficiency by 20%.
  • Documentation of time-study results, VSM, proposed workstation layouts, implementation plan and training materials for operators.

Candidate profile

  • Industrial Engineer or equivalent with interest/experience in ergonomics, process optimization and Lean manufacturing.
  • Skills in time studies, VSM, cycle time analysis, ergonomics assessment, data analysis and practical implementation of 5S.

📧 Pour postuler: hrtn@hubersuhner.com