Nexans Autoelectric Tunisia
Tunisie

33 Establishment of a Start-up Concept for the LAD Line Department PFE

industrial engineeringGénie industriel / Lean manufacturingCAD/CAE

Publié il y a environ 16 heures

Stage
⏱️4-6 mois
💼Hybride
📅Expire dans 13 jours
Contacte 1 personne déjà partie.

Description du poste

Project overview

  • Objective: Define a clear and structured process for the start-up of the LAD production line to reduce start-up time and stabilize first-pass quality.
  • Context: Production profile: Industrial Engineering; assignment performed by two interns over a 6-month period.

Tasks & responsibilities

  • Analyze current LAD line start-up processes, identify bottlenecks and variability sources during start-up sequences.
  • Define standard operating procedures (SOPs) for line start-up, including checklists, sequence steps and roles/responsibilities.
  • Balance workstations and calculate takt times to ensure workload distribution matches production targets and takt.
  • Apply Lean tools (value stream mapping, 5S, kaizen), MTM methods, and optimization techniques to improve efficiency and reduce waste.
  • Create process documentation and CAD layouts for implementation of the new start-up concept (workstation layouts, material flow, ergonomic considerations).
  • Support pilot testing of the new start-up concept on the LAD line and iterate based on pilot feedback.

Required skills & tools

  • Knowledge of Lean tools, takt time calculation, MTM (Methods-Time Measurement) and workstation balancing techniques.
  • Experience with optimization techniques for production lines and familiarity with pilot testing methodologies.
  • Proficiency in CAD to produce layouts and documentation for implementation (station dimensions, tooling placement, material flow).
  • Analytical mindset, ability to collect and analyze time studies, and to translate findings into actionable SOPs.

Deliverables & expected outcomes

  • Documented analysis of current start-up process with identified improvement opportunities.
  • Standard operating procedures for LAD line start-up and workstation balancing reports including takt time calculations.
  • CAD layouts and process documentation ready for implementation and pilot testing support materials.
  • Recommendations and implementation plan to roll out the start-up concept across the LAD department.

Application

  • To apply, contact: G-TN-StagePFE@autoelectric.com .
  • Please use the email subject: "Application — Subject 33: Establishment of a Start-up Concept for the LAD Line Department PFE" when sending your application.
Nexans Autoelectric Tunisia - 33 Establishment of a Start-up Concept for the LAD Line Department PFE | Hi Interns