Bako Motors SAS
Bako Motors SAS
Tunisie

21 Assembly Line Balancing Using Simulation Tools PFE

industrial engineeringSimulation & ModelingManufacturing/Production Engineering

Publié il y a 6 mois

Stage
⏱️4-6 mois
💼Hybride
📅Expiré il y a 6 mois
Reste lisible (ATS friendly).

Description du poste

Project objective

  • Use software (e.g., FlexSim, Tecnomatix) to simulate and balance workloads across stations.
  • Improve assembly line performance by applying line balancing techniques and cycle time optimization.

What you will do

  • Build and validate simulation models of existing assembly lines using industrial simulation tools (FlexSim, Tecnomatix or similar).
  • Analyze station workloads, identify bottlenecks and propose layout or task redistribution to achieve balanced takt times.
  • Produce and interpret Yamazumi charts and other visualizations to support balancing decisions.

Required expertise & tools

  • Understanding of production and assembly line operations and line balancing techniques (e.g., Yamazumi charts, cycle time optimization).
  • Experience with simulation or industrial engineering tools (FlexSim, Tecnomatix, or equivalent) and data analysis for throughput and resource utilization.

Department, supervision & logistics

  • Department: Methods.
  • Number of trainees: 1.
  • This PFE involves close collaboration with production and methods teams to collect cycle times, station tasks and validation data.

How to apply

  • To apply, send your CV and a short cover letter referencing this specific project to hr@bakomotors.com.
  • Use the email subject line: "Application for 21 Assembly Line Balancing Using Simulation Tools PFE" and indicate your availability and expected project duration.